top of page

KY River Lock 10 Rehabilitation

August 2021

C SQUARED EXCAVATING become involved with this project in the summer of 2021. Completion of the main fill area, channel lining / erosion control, and site final grade outlined the scope of this project for us. We completed this project in Dec 2021

KYLock10_110421_423 2_edited.jpg
KY River Lock 10 Rehabilitation: Projects
KY River Lock 10 Rehabilitation: Pro Gallery

C SQUARED
EXCAVATING LLC

(859) 321-5960 / (859) 533-5339

119 Morgan Manor Dr
Georgetown, KY 40324
USA

  • Facebook

©2022 by C SQUARED EXCAVATING

bottom of page